Building Project
Update
▬
July 2007
(Click on
thumbnail to view larger image.)
Niskayuna High School
|
|
|
|
|
|
|
A view of the entrance to administrative offices and the counseling center, temporarily relocated to a renovated section of the north cafeteria. |
|
|
|
|
|
|
|
|
|
|
|
|
Staff members have settled in to their new office space. |
|
|
|
|
|
|
|
|
|
|
|
|
A view of the counseling center. |
|
|
|
|
|
|
|
|
|
|
|
|
Staff and student workers have been setting up the temporary media center located in the old wrestling gym. |
|
|
|
|
|
|
|
|
|
|
|
|
In July, C-Hall was partitioned off for asbestos removal before demolition begins in early August. |
|
|
|
|
|
|
|
|
|
|
|
|
The old main office is being renovated for use as classrooms. |
|
|
|
|
|
|
|
|
|
|
|
|
This entrance to the old media center will soon lead to temporary classrooms and office space. |
|
|
|
|
|
|
|
|
|
|
|
|
A peak at ongoing renovations inside the old media center. |
|
|
|
|
|
|
|
|
|
|
|
|
Work crews will have the classrooms ready for students before school starts in September. |
|
|
|
|
|
|
|
|
|
|
|
|
The renovations require that ceiling tiles be removed temporarily for ventilation and electrical work. |
|
|
|
|
|
|
|
|
|
|
|
|
Walls have been constructed dividing the once open area into several classrooms. |
|
|
|
|
|
|
|
|
|
Craig
Elementary School
|
|
|
|
|
|
|
Renovations are underway at Craig Elementary School. |
|
|
|
|
|
|
|
|
|
|
|
|
A worker prepares air ducts for installation of new heating and ventilation systems. |
|
|
|
|
|
|
|
|
|
|
|
|
While the heating system is being replaced, ceiling tiles will remain down in the main hallways of the school. |
|
|
|
|
|
|
|
|
|
|
|
|
Excavation is taking place outside Craig School where a new classroom addition will be constructed. |
|
|
|
|
|
|
|
|
|
|
|
|
A closer look at the location where the new four classroom addition will be built. |
|
|
|
|
|
|
|
|
|
|
|
|
Once excavation is complete, concrete footings for the addition will be poured. |
|
|
|
|
|
|
|
|
|
Glencliff
Elementary School
|
|
|
|
|
|
|
Workers prepare the north end of Glencliff School for a new three classroom addition. |
|
|
|
|
|
|
|
|
|
|
|
|
Excavation has started at the south end of the school where two classrooms will be added. |
|
|
|
|
|
|
|
|
|
|
|
|
A look at some of the construction equipment and materials that will be used to build Glencliff's new additions. |
|
|
|
|
|
|
|
|
|
|
|
|
School officials join the project manager and the district's architect for a tour of the renovations. |
|
|
|
|
|
|
|
|
|
|
|
|
Old heating units will be replaced with a more energy efficient system. |
|
|
|
|
|
|
|
|
|
|
|
|
Ceiling tiles have been removed in the main hallways to prepare for installation of new ventilation and heating systems. |
|
|
|
|
|
|
|
|
|
|
|
|
Members of the district's maintenance staff work around the construction and renovations to prepare the school for September. |
|
|
|
|
|
|
|
|
|
Van
Antwerp Middle School
|
|
|
|
|
|
|
Replacement of the heating and ventilation sytems at Van Antwerp Middle School require ceiling tiles to be removed on the first floor. |
|
|
|
|
|
|
|
|
|
|
|
|
Ceiling tiles have also been removed from the main corridors on VA's second floor. |
|
|
|
|
|
|
|
|
|
|
|
|
Workers on the second floor of VA. |
|
|
|
|
|
|
|
|
|
|
|
|
A new ramp will be installed on the second floor to improve handicapped accessibility. |
|
|
|
|
|
|
|
|
|
|
|
|
A view into a section of the crawl space where piping for the new heating system will be installed. |
|
|
|
|
|
|
|
|
|
|
|
|
This area of VA's basement is being renovated and will eventually serve as a central location for the school's computer network. |
|
|
|
|
|
|
|
|
|
to top |