transparent spacerShortcut to main content on page photo of computer students transparent spacer
Niskayuna Central School District link to emergency announcements
transparent spacer
transparent spacer transparent spacer link to district home page transparent spacer Visit Our Schools Menu
transparent spacer
School construction project details
Construction project main page
Building Vote logo
Link to more details:
Work to be done by school -- including proposed floorplans
Local cost
Frequently Asked Questions
Archives

Scroll down, or skip to a section:
Birchwood Elementary
Craig Elementary
Glencliff Elementary
Hillside Elementary
Rosendale Elementary

Iroquois Middle
Van Antwerp Middle

Niskayuna High School




ELEMENTARY SCHOOLS

Birchwood Elementary School ($5.4 million):  See the proposed layout
* Add 5 Classrooms (to maintain neighborhoods schools and class size, for students with disabilities, and to replace displaced classrooms – see below)
* Convert 2 Existing Classrooms for Tutoring, Speech, Counseling, Testing, Student Therapies
* Upgrade Main Entrance
* Replace Building Heating System with a More Efficient Hot Water System
* Renovate Playground (funded by building PTO)
* Install New Telephone System in Classrooms and Offices
* Update Classroom Computer Technology
* Replace Windows and Provide Screens and Blinds
* Purchase Classroom Furniture and Equipment
* Replace and Increase Exterior Lighting
* Install Security Cameras at Key Locations
* Traffic Safety Improvements
* Provide Exterior Doors in Classrooms that Do Not Have Them
* Replace Electrical Distribution Panel
* Platform Lift to Stage for Handicap Accessibility
* Replace Classroom Carpeting with Vinyl Tile
* Asbestos Abatement (e.g. floor tile replacement)
* Update Fire Safety Systems
* Improve Handicap Accessibility to Building (automatic door at front entrance, door hardware, etc.)

Craig Elementary School ($6.4 million):
See the proposed layout
* Add 5 Classrooms (to maintain neighborhoods schools and class size, for students with disabilities, and to replace displaced classrooms – see below)
* Convert 2 Existing Classrooms for Tutoring, Speech, Counseling, Testing, Student Therapies
* Upgrade Main Entrance
* Replace Building Heating System with a More Efficient Hot Water System
* Renovate Playground (funded by building PTO)
* Install New Telephone System in Classrooms and Offices
* Update Classroom Computer Technology including Wireless Local Area Network
* Replace Windows and Provide Screens and Blinds
* Purchase Classroom Furniture and Equipment
* Replace and Increase Exterior Lighting
* Install Security Cameras at Key Locations
* Traffic Safety Improvements
* Provide Exterior Doors in Classrooms that Do Not Have Them
* Replace Electrical Distribution Panel
* Platform Lift to Stage for Handicap Accessibility
* Replace Classroom Carpeting with Vinyl Tile
* Asbestos Abatement (e.g. floor tile replacement)
* Update Fire Safety Systems
* Improve Handicap Accessibility to Building (automatic door at entrance, door hardware, etc.)
* Drainage and Field Improvements
* Ceiling Replacement in Main Office and Cafeteria

Glencliff Elementary School ($5.9 million):
See the proposed layout
* Add 5 Classrooms (to maintain neighborhoods schools and class size, for students with disabilities, and to replace displaced classrooms – see below)
* Convert 2 Existing Classrooms for Tutoring, Speech, Counseling, Testing, Student Therapies
* Upgrade Main Entrance
* Replace Building Heating System with a More Efficient Hot Water System
* Renovate Playground (funded by building PTO)
* Install New Telephone System in Classrooms and Offices
* Update Classroom Computer Technology including Wireless Local Area Network
* Replace Windows and Provide Screens and Blinds
* Purchase Classroom Furniture and Equipment
* Replace and Increase Exterior Lighting
* Install Security Cameras at Key Locations
* Traffic Safety Improvements
* Replace Electrical Distribution Panel
* Platform Lift to Stage for Handicap Accessibility
* Replace Classroom Carpeting with Vinyl Tile
* Asbestos Abatement (e.g. floor tile replacement)
* Update Fire Safety Systems
* Improve Handicap Accessibility to Building (automatic door at entrance, door handles, etc.)
* Sanitary Sewer Pipeline Connection to Riverview Road With Pump Station
* Re-point Exterior Brick and Repair Vertical Cracks

Hillside Elementary School ($5.7 million):
See the proposed layout
* Add 5 Classrooms (to maintain neighborhoods schools and class size, for students with disabilities, and to replace displaced classrooms – see below)
* Convert 2 Existing Classrooms for Tutoring, Speech, Counseling, Testing, Student Therapies
* Upgrade Main Entrance
* Replace Building Heating System with a More Efficient Hot Water System
* Renovate Playground (funded by building PTO)
* Install New Telephone System in Classrooms and Offices
* Update Classroom Computer Technology including Wireless Local Area Network
* Replace Windows and Provide Screens and Blinds
* Purchase Classroom Furniture and Equipment
* Replace and Increase Exterior Lighting
* Install Security Cameras at Key Locations
* Traffic Safety Improvements
* Platform Lift to Stage for Handicap Accessibility
* Replace Classroom Carpeting with Vinyl Tile
* Asbestos Abatement (e.g. floor tile replacement)
* Update Fire Safety Systems
* Improve Handicap Accessibility to Building (elevator, automatic door at entrance, door handles, etc.)
* Rebuild Chimney
* Replace Ceilings in Selected Areas
* Replace Carpeting in Library

to top


Rosendale Elementary School ($5.4 million):
See the proposed layout
* Add 5 Classrooms (to maintain neighborhoods schools and class size, for students with disabilities, and to replace displaced classrooms – see below)
* Convert 2 Existing Classrooms for Tutoring, Speech, Counseling, Testing, Student Therapies
* Upgrade Main Entrance
* Replace Building Heating System with a More Efficient Hot Water System
* Renovate Playground (funded by building PTO)
* Install New Telephone System in Classrooms and Offices
* Update Classroom Computer Technology including Wireless Local Area Network
* Purchase Classroom Furniture and Equipment
* Replace and Increase Exterior Lighting
* Install Security Cameras at Key Locations
* Traffic Safety Improvements
* Replace Electrical Distribution Panel
* Platform Lift to Stage for Handicap Accessibility
* Replace Classroom Carpeting with Vinyl Tile
* Asbestos Abatement (e.g. floor tile replacement)
* Update Fire Safety Systems
* Improve Handicap Accessibility to Building (automatic door at entrance, door handles, etc.)
* Replace Exterior Doors
* Re-point Exterior Brick and repair Vertical Cracks
* Install Exterior Wall Expansion Joints
* Replace Ceilings in Selected Classrooms
* Install a Water Pipeline Connection Loop

to top


MIDDLE SCHOOLS

Iroquois Middle School ($4.3 million):
* Enhance and Define Main Entrance
* Heating Control Upgrades (to allow better control of classroom temperature)
* Air Conditioning in the Media Center
* Install New Telephone System in Classrooms and Offices
* Update Classroom Computer Technology including Wireless Local Area Network
* Replace Windows and Provide Screens and Blinds
* Purchase Classroom Furniture and Equipment
* Storm Drainage Improvements
* Traffic Safety Improvements
* Replace Corridor Lockers
* Replace Ceilings and Lighting in Selected Areas
* Replacement of Selected Fixtures in Bathrooms
* Reconstruct Selected Bathrooms
* Carpet Replacement in Music Practice Rooms
* Install Security Cameras at Key External Locations
* Provide Additional Power to Technology Rooms, Media Center and Classrooms
* Art Room Reconstruction (2 rooms)
* Home & Careers Room Reconstruction (2 rooms)
* Update Fire Safety Systems
* Improve Handicap Accessibility to Building (automatic door at entrance, door handles, etc.)
* Drainage and Field Improvements
* Install Security Cameras at Key Locations

Van Antwerp Middle School ($8 million):
* Replace Building Heating Systems with a More Efficient Hot Water System
* Install New Telephone System in Classrooms and Offices
* Update Classroom Computer Technology including Wireless Local Area Network
* Roof Repair
* Rebuild and Re-point Parapet Brick Walls
* Traffic Safety Improvements
* Drainage and Field Improvements
* Vinyl Tile Replacement in Selected Areas
* Update Fire Safety Systems
* Provide Additional Power to Technology Rooms, Media Center and Classrooms
* Reconstruct Science Rooms (2)
* Improve Handicap Accessibility to Building (wheelchair lift, automatic door at entrance, door handles, etc.)
* Purchase Classroom Furniture and Equipment
* Install Security Cameras at Key Locations

to top


Niskayuna High School ($53.2 million):
See the proposed layout
* Add 8 classrooms (6 due to enrollment and scheduling, 1 Special Education, 1 Science)
* Provide a Study Commons
* Reconfigure Program Space for Technology
* New Expanded Media Center Relocated to Building Center
* Relocate Principals’ Offices to Main Entrance
* Access Card Control System for Staff Entering the Building After-hours
* Provide Additional Security Cameras at Key Locations
* Replace Windows and Provide Screens and Blinds
* New Bus Loop and Student Entrances
* Replace Roof
* Rebuild Chimney
* Replace Corridor Ceilings and Lighting
* Repair Greenhouse
* Replace Lockers in Boys and Girls Locker Rooms
* Replace Building Heating System with Geothermal Heat Pump System
* Install New Telephone System in Classrooms and Offices
* Update Classroom Computer Technology including Wireless Local Area Network
* Replace Galvanized Piping in Older Additions
* Replace Showers in Locker Rooms
* Replace Drinking Fountains
* Upgrade Electrical Service
* Replace Public Address/Sound System in Classrooms
* Provide New Electrical Panels for Technology Rooms
* Replace and Increase Exterior Lighting
* Provide Auditorium Lighting and Sound System
* Create New Music Suite Adjoining the Auditorium
* Provide Sound System in both Gymnasiums
* Replace Asbestos Floor Tile with Vinyl Tile
* Provide New Casework in 4 Art Classrooms
* Purchase Classroom Furniture and Equipment
* Provide New Casework in 2 Home & Careers Rooms
* Provide New Casework in 5 Science Rooms
* Renovate Bathrooms
* Renovate Elevator
* Install Sprinkler System in Stage Area
* Re-design New Traffic Circles and Pedestrian Crossings to Increase Student Safety
* Repave the Parking Lot



 

to top
facilities main page

 

transparent spacer
This page is maintained by Judy Frost, Communications Specialist, according to web publishing guidelines used by the Niskayuna Central School District. All rights reserved. This web site was produced in cooperation with the Capital Region BOCES Communications Service. © 2003