spacer graphic links to main page contentShortcut to main content on page photo of computer students transparent spacer
Niskayuna Central School District header graphic link to emergency announcements
transparent spacer
transparent spacer transparent spacer link to district home page transparent spacer Visit Our Schools Menu
transparent spacer transparent spacer
Celebrating more than 50 years graphic
transparent spacer
 Niskayuna A-Z
 Academics
 Alumni
 Athletics
 Board of Education
 Calendars
 Community Ed.
 Contact Us
 Feedback
 Human Resources
 Library
 Parent Corner
 Publications/Forms
 Search Our Site
 Special Education
 Staff Information
 Transportation
 e-Community Board
School District Facility Study
Examination of Facility Alternatives, Grade and Building Configurations and Facility Needs

Following an extensive year-long facility study, the District Facility Renewal and Preservation Committee has compiled a 282-page booklet of its findings. The majority of that book can be accessed below. The committee presented its findings to the Board of Education on December 20, 2004 and January 3, 2005. [Read meeting synopses.] The Board of Education will be reviewing this material at upcoming meetings. [See schedule.]

If you have questions about any of this information, please contact Superintendent Kevin Baughman at kbaughman@niskyschools.org or by telephone at (518) 377-4666, Ext. 206.

*Note: Some documents below (as labeled) are documents in PDF format. Such documents require Adobe Acrobat Reader to be viewed, which can be downloaded for free from the Adobe Acrobat web site.

graphic bulletIntroduction/Executive Summary
graphic bullet2004 District Facility Renewal and Preservation Committee member list
graphic bulletRecommended Project Timeline
graphic bulletCapital Project Needs by building (PDF) *Please note: All estimated prices in these pages include an extra 25% to cover legal fees, architectural fees, bonding fees and increased costs due to inflation. Once the Board of Education determines the project scope, revised cost estimates will be posted.*
graphic bulletProjected Enrollment
graphic bulletHigh School Task Force report (PDF)
graphic bulletNew High School Cost Scenario (PDF)
graphic bulletFacilities Project Cost Scenario (PDF)

graphic bullet
Floor plans showing possible building changes (dark grey areas = addition possibilities; light grey areas = renovation possibilities):
Birchwood Elementary School (PDF)
Craig Elementary School (PDF)
Glencliff Elementary School (PDF)
Hillside Elementary School -- second floor (PDF)
Hillside Elementary School -- first floor (PDF)
Rosendale Elementary School (PDF)
Iroquois Middle School -- lower floor (PDF)
Iroquois Middle School -- upper floor (PDF)
Van Antwerp Middle School -- lower floor (PDF)
Van Antwerp Middle School -- upper floor (PDF)
Niskayuna High School (PDF)
 

to top

to Construction Project main page

transparent spacer
  This page is maintained by Judy Frost, Communications Specialist, according to web publishing guidelines used by the Niskayuna Central School District. All rights reserved. This web site was produced in cooperation with the Capital Region BOCES Communications Service. © 2003