Construction project main page
Building Vote logo
Link to more details:
Work to be done by school -- including proposed floorplans
Local cost
Frequently Asked Questions
Archives

 Building review archives

Download the 7-minute video summarizing the project
Download the video
Note: This is a 1.27 mb video that requires Windows Media Player to be viewed.

graphic bullet Board of Education reduces final construction project scope
In November 2005, the Board of Education unanimously decided to reduce the scope of the building project to $94.5 million to maximize state aid. Details

Student enrollment growing
In preparation for the facility review, student enrollment projections were developed, projecting how many students would attend Niskayuna schools through 2009. Those projections were updated in fall 2005.
Read a summary of the updated findings

Read the updated projection documents (this is an Excel document)

Facility review study
Read the District Facility Renewal and Preservation Committee's 282-page study (completed in January 2005), which found a potential for up to $115 million in construction, from building additional classroom space, to replacing leaking roofs and inefficient 50-year-old heating systems.  Read the study

Study overview -- the basics
The winter 2004-05 edition of Your Schools (mailed to residents in February 2005) contains facility study highlights. Download the newsletter (this is a PDF document), or read a section:
Building review process overview: Study identifies major facility needs, including expansion
Construction needs by school level
What it would cost local taxpayers
Temporary measures for overcrowding 

graphic bulletDecember 20 and January 3 presentation synopses
The District Facility Renewal and Preservation Committee presented its findings to the Board of Education on December 20, 2004 and January 3, 2005. Read a synopsis of each meeting: December 20 (focusing on elementary school needs) and January 3 (focusing on high school and middle school  needs)

graphic bulletMeeting minutes from the District Facility Renewal and Preservation Committee can be downloaded below (these are all PDF documents). The group, which has about 30 community, parent and staff members, compiled reviews performed by school teams and the High School Task Force, and made recommendations to the Board of Education (see presentation synopses above).
-November 3, 2004 minutes
-October 13, 2004 minutes
-October 6, 2004 minutes
-September 13, 2004 minutes
-July 7, 2004 minutes
-June 17, 2004 minutes
-June 9, 2004 minutes
-June 2, 2004 minutes
-May 26, 2004 minutes
-May 19, 2004 minutes

graphic bulletRead a facility review process letter sent to all parents in late October 2004, from Superintendent Kevin Baughman
Parent letter

Board examines 3 high school options
At early meetings, the Board of Education examined three options for renovation and addition to the high school. Architectural drawings of those options can be downloaded here (these are PDF documents):
Option A
Option B
Option C
the high school's current layout

 

transparent spacer
This page is maintained by Judy Frost, Communications Specialist, according to web publishing guidelines used by the Niskayuna Central School District. All rights reserved. This web site was produced in cooperation with the Capital Region BOCES Communications Service. © 2003